Reno, Nevada

 


Glen Duncan Joint Use Library is approximately 3,200 sf, and construction cost $400,000. The building and program serve the community through a joint use agreement between Washoe County School District and the Washoe County Library System. This small branch library is able to be easily expanded through the addition of additional modular units. The project was built and erected during a single ten week summer school break.



Additional modular building projects designed by Barada-Fuetsch Architects for the school district include 2, 4, and 6 classroom buildings comprised of 12 foot widew by 38 foot long 'modules', which can be seperated and relocated. Modular buildings have been designed for the following school sites throughtout the district:

Anderson Elementary, Reno
Libby Booth Elementary, Reno
Rita Cannon Elementary, Reno
Roger Corbett Elementary, Reno
Florence Drake Elementary, Reno
Glenn Duncan Elemenatry, Reno
Incline Elementary and Incline High (ROTC), Incline Village
Katherine Dunn Elementary, Reno
Lena Juniper Elementary, Reno
Lemmon Valley Elementary
Lincoln Park Elementary, Sparks
Echo Loder Elementary, Reno
Alice Maxwell Elementary, Sparks
Natchez Elementary
Pleasant Valley Elementary
Agnes Risely Elementary, Sparks
Kate Smith Elementary, Sparks
Smithridge Elementary, Reno
Stead Elementary, Reno